Wakiso-Mukono Building Plans Approval
As Mapok Construction Limited, we handle the project design (drawings/plans) either with an in-house Architect or an established design partner/registered & practicing Architect, and registered & practicing Structural Engineer, it streamlines communication and helps speed up the construction process. You also have the option of...
Continue Reading
KCCA revised construction rules
For you (the developer) to obtain a building plan (approved) and a Job Card you must prove to KCCA that you have a qualified Contractor and the Project is supervised by a registered & practicing Architect and a registered & practicing Engineer at all stages...
Continue Reading
KCCA Building Plans Submission Check List
KCCA Application Form fully filled by Client, client’s contact (phone number). Copy of Land title(s). Search Statement within a period of three months from the date of issuance.Payment receipts (UGX 2,000,000-UGX 4,000,000). Old approved plan(s) for extensions and alterations or submission of as built drawings....
Continue Reading
Engineers Registration
Registration of engineers remains an internationally recognized approach for controlling and regulating professional practice in a jurisdiction for good conduct of practice. It isolates and checks masqueraders, enforces discipline, streamlines responsibilities, clarifies legal roles and responsibilities and confers professional prestige and esteem. Therefore, at Mapok...
Continue Reading
Anti-termite treatment in foundation
Pre construction anti termite treatment is a process in which soil treatment is applied to a building in early stages of its construction. The purpose of anti termite treatment is to provide the building with chemical barrier against the sub terrain termites. The pre construction...
Continue Reading
Effect of different types of water and cement mortars
Water is mixed with the cement powder to form a paste which holds the sand and/or aggregates togetherlike glue. Many builders use any water which is available easily on the site such as bore well water, water from the swamp etc. for mixing the cement...
Continue Reading
Lack of site clearance can affect your structure.
The main purpose of site clearance is to remove vegetation and most IMPORTANTLY, the surface layer of soil referred to as topsoil. It is necessary to remove this layer of soil, as it is unsuitable to build on. This surface layer of soil is difficult...