Call Us On 0772344226/0750340098
info@mapokconstruction.com Muwaya Lane, Ring Road, Mutungo Zone2,Nakawa Division, Kampala

Anti-termite treatment in foundation

Pre construction anti termite treatment is a process in which soil treatment is applied to a building in early stages of its construction.


The purpose of anti termite treatment is to provide the building with chemical barrier against the sub terrain termites.


The pre construction soil treatment is required to be applied during the sub-structure up to ground floor slab level.


In the event of water logging of foundation, the water is pumped out before application of chemical emulsion and it is applied only when the soil is absorbent.


If you are planning to construct your housing complexes, office towers, shopping malls, residential homeschool, church, industrial plant etc. termite control is one of the first things you should think of. We use highly professional techniques for treating the termite infestation problem. Application of liquid pesticide (termicide) in areas like the foundation, within the foundation walls and also areas under the concrete slabs is part of our specialized termite control treatment plan.
Pre construction termite treatment stages:

  1. We treat the sides and bottom surface of the foundation trenches and pits with chemical.
  2. Back fill earth on each side of all built up walls, which will be in immediate contact with the foundation, should be treated with chemical. The chemical shall be directed towards the masonry surfaces so that earth in contact with these surfaces is well treated with the chemical.
  3. Before laying the floor, we treat the top surface of the consolidated earth within the plinth walls with chemical. We ensure back fill against foundation is treated to its full depth.

Leave A Reply

Your email address will not be published. Required fields are marked *

WeCreativez WhatsApp Support
Our customer support team is here to answer your questions. Ask us anything!
👋 Hi, how can I help?